Our unique factory-prefabricated and modular building system operates within a seamlessly coordinated framework. In just a few weeks, up to 80% of the house construction can be completed off-site, with all components delivered ready for on-site installation. Compared to traditional construction methods, our approach offers significant environmental and performance benefits: on-site waste is reduced by up to 85%, 80% of materials are recyclable, construction time is shortened by 50%–70%, and seismic resistance can reach a magnitude of 9.

Construction & Manufacturing Workflow

1. Architectural design.

2. Drawing of steel frame panelized structure.

3. Steel frame fabrication in Chinese factory.

4. Production of lightweight composite floor slabs.

5. Production of lightweight composite wall panels.

6. Pre-installation of windows and MEP systems.

7. Standard container packing.

8. Delivery of prefabricated components.

9. On-site steel frame assembly.

10. Installation of wall panels and floor slabs.

11. Interior finishing.

12. Final completion and handover.